Detailed information about the performed installation and commissioning works 

 

 

Project name

Maintenance and measuring works at 220 kV substation of Yerevan CCPP-2

Customer

«Armpower» CJSC (Armenia)

Year

2022

Scope of work

  • Checking the tightness of the clamps of wire connections between 220 kV OHL and disconnectors, VTs, surge arresters and six wire connections between CB and CT
  • Checking the tightness of the clamps of the connected cables of the substation
  • Checking the connection of the metal body and metal structures of the equipment with the earthing circuit with an Ohmmeter
  • Measuring the resistance of the earthing loop of the substation
  • Measuring the transition resistance of the main contacts of 220 kV switch disconnectors and earthing knives
  • Testing of personal protective equipment (insulating mats, dielectric boots, gloves, insulating rods, etc.) to protect against electric shock

 

Project name

Power panels installation for pumping stations

Customer

«Kotayk Water Users» (Armenia)

Year

2022

Scope of work

  • Manufacturing and installation of the protection panel for the motor 33 kWt (10-50A)
  • Manufacturing and installation of the protection panel for the motor 160 kWt (40-280A)
  • Manufacturing and installation of the protection panel for the motor 75 kWt (30-130A)
  • Manufacturing and installation of the protection panel for the motor 25 kWt (10-40A)
  • Manufacturing and installation of the protection panel for the motor 45 kWt (10-80A)
  • Manufacturing and installation of the protection panel for the motor 30 kWt (10-90A)
  • Manufacturing and installation of the protection panel for the motor 36 kWt (10-50A)
  • Manufacturing and installation of the protection panel for the motor 37 kWt (10-50A)

 

Project name

Complete repair of 10 kV inductive single-phase transformer

Customer

«RUSAL-Armenal» CJSC (Armenia)

Year

2022

Scope of work

  • Dismantling of the power transformer and transportation to the repair platform
  • Purifying, drying and recirculation of the transformer oil
  • Complete painting of the power transformer body
  • Replacement of gaskets
  • Tap changer replacement
  • Complete replacement of the electrical system of the transformer
  • Complete repair of HV and LV bushings
  • Complete commissioning of the transformer

 

Project name

Complete rehabilitation of 110/10, 16000 kVA transformer

Customer

“South Caucasian Railroad” CJSC

Year

2021

Scope of work

  • Dismantling and re-allocation of the transformer
  • Supply and installation of the windings
  • Supply and re-filling of the transformer oil
  • Complete re-painting of the transformer body
  • Complete replacement of the electrical systems of the transformer
  • Complete rehabilitation of the 110 kV and 10kV bushings
  • Complete commissioning of the transformer

 

Project name

Complete rehabilitation of 110/10, 16000 kVA transformer

Customer

“South Caucasian Railroad” CJSC

Year

2021

Scope of work

  • Dismantling and re-allocation of the transformer
  • Supply and installation of the windings
  • Supply and re-filling of the transformer oil
  • Complete re-painting of the transformer body
  • Complete replacement of the electrical systems of the transformer
  • Replacement of 110 kV and repair of 10kV bushings
  • Complete commissioning of the transformer

 

Project name

Construction of new 220 kV substation for Yerevan CCPP-2

Customer

“Artashat ENC” LLC (Armenia)

Year

2019-2021

Scope of work

  • Installation of 220 kV power and commutation equipment
  • Installation of the steel structures
  • Supply and installation of control and power cables
  • Supply and installation of Marshaling kiosks
  • Supply and installation of post insulators
  • Supply and installation of earthing system
  • Installation of lightning protection system
  • Supply and installation of external lighting system
  • Supply and installation of AC/DC panels
  • Installation of die-cast connectors
  • Full set of commissioning works

 

Project name

Rehabilitation of 220 kV substation at Spandaryan HPP

Customer

EFACEC Engenharia e Sistemas, S.A. (Portugal)

Year

2018 – 2021

Scope of work

  • Dismantling of power and commutation equipment of 220 kVswitchyard
  • Dismantling of 12 kV power panels
  • Dismantling of protection and automation systems
  • Dismantling of steel structures
  • Dismantling of foundations under the equipment
  • Dismantling of cable channels
  • Dismantling of power and control cables
  • Installation of power and commutation equipment of 220 kVswitchyard
  • Installation of 12 kV power panels
  • Installation of control and protection systems
  • Installation of steel structures
  • Manufacturing and installation of the foundations under theequipment
  • Manufacturing and installation of the concrete covers of the cablechannels
  • Installation of power and control cables
  • Installation of reserve diesel-generator
  • Commissioning of power and commutation equipment
  • Commissioning of reserve diesel-generator

 

Project name

Rehabilitation of 220 kV substation at Shamb HPP

Customer

EFACEC Engenharia e Sistemas, S.A. (Portugal)

Year

2018 – 2021

Scope of work

  • Dismantling of power and commutation equipment of 220 kVswitchyard
  • Dismantling of 12 kV power panels
  • Dismantling of protection and automation systems
  • Dismantling of steel structures
  • Dismantling of foundations under the equipment
  • Dismantling of cable channels
  • Dismantling of power and control cables
  • Dismantling and re-allocation of 125 MVA transformers
  • Complete repair of 125 MVA transformers
  • Installation of power and commutation equipment of 220 kVswitchyard
  • Installation of 12 kV power panels
  • Installation of control and protection systems
  • Installation of steel structures
  • Manufacturing and installation of the foundations under theequipment
  • Manufacturing and installation of the concrete covers of the cable channels
  • Installation of power and control cables
  • Installation of reserve diesel-generator
  • Commissioning of power and commutation equipment
  • Commissioning of reserve diesel-generator

 

Project name

Rehabilitation of 110 kV substation at Tatev HPP

Customer

EFACEC Engenharia e Sistemas, S.A. (Portugal)

Year

2018 – 2021

Scope of work

  • Dismantling of power and commutation equipment at 110 kVswitchyard
  • Dismantling of 12 kV power cubicles at switchgear
  • Dismantling of protection and automation system
  • Dismantling of steel structures
  • Dismantling of power and control cables
  • Dismantling and re-allocation of 80 MVA power transformer
  • Installation of power and commutation equipment at 110 kVswitchyard
  • Installation of 12 kV power cubicles at switchgear
  • Installation of protection and automation system
  • Installation of steel structures
  • Installation of power and control cables
  • Installation of reserve diesel-generator
  • Commissioning of power and commutation equipment
  • Commissioning of reserve diesel-generator

 

Project name

Complete rehabilitation of 110/10, 16000 kVA transformer

Customer

“South Caucasian Railroad” CJSC

Year

2020

Scope of work

  • Dismantling and re-allocation of the transformer
  • Supply and installation of the windings
  • Supply and re-filling of the transformer oil
  • Complete re-painting of the transformer body
  • Complete replacement of the electrical systems of the transformer
  • Complete rehabilitation of the 110 kV and 10kV bushings
  • Complete commissioning of the transformer

 

Project name

Installation of electrical systems and sub-systems on the crusher platform

Customer

“Lydian Armenia” CJSC

Year

2018 - to be announced

Scope of work

  • Installation of cable constructions and channels
  • Installation of power and control cables
  • Installation of external lighting poles
  • Installation of conveyor internal lighting
  • Installation of connection and end terminations
  • Complex commissioning of the system

 

Project name

Installation and commissioning of emergency generator for fuel station and Biodisc

Customer

“Lydian Armenia” CJSC

Year

2018

Scope of work

  • Installation and commissioning of diesel generator set
  • Installation of power and control cable
  • Manufacturing and installation of steel fence
  • Civil construction works

 

Project name

Chief-montage and full set of commissioning works at Main 110/35/6 kV substation

Customer

“Lydian Armenia” CJSC

Year

2018

Scope of work

  • Chief-montage of 110 kV power and commutation equipment
  • Chief-montage of steel structures
  • Full set of commissioning services for power and commutation equipment at switchyard
  • Commissioning of relay protection and automation systems

 

Project name

Commissioning of measurement equipment and LV systems

Customer

“Lydian Armenia” CJSC

Year

2018 – to be announced

Scope of work

  • Commissioning of analog equipment
  • Commissioning of measurement systems
  • Commissioning of LV systems and equipment
  • Commissioning of control systems

 

Project name

LV system and container type substations installation

Customer

“Lydian Armenia” CJSC

Year

2017 – to be announced

Scope of work

  • Construction of foundations for equipment
  • Installation of container type substations and E-houses
  • Installation of power cables
  • Installation of cable channels
  • Functional commissioning of container substations and E-houses
  • Installation and commissioning of power transformers
  • Installation of end terminations

 

Project name

Rehabilitation of 110 kV substation at Voxjhi HPP

Customer

Kapan Energy CJSC (Armenia)

Year

2017

Scope of work

  • Consultation and supervision of design works and civil construction
  • Installation of equipment and machinery in 110 kV switchyard
  • Installation of equipment and machinery in control building and 6 kV switchgear
  • Installation of lightning protection system
  • Manufacturing and installation of steel structures, cable racks for 6 kVcables
  • Connection of all equipment to the substation earthing system
  • Installation of control, measuring, communication and relay protection panels for 110 kV and 6 kV switchgears
  • Installation of LV control and power cables
  • Installation of MV control and power cables
  • Installation of auxiliary supply equipment - AC distribution boards, DC distribution boards, battery and chargers
  • Commissioning of all installed equipment and system

 

Project name

Extension of 110/35/6 kV substation Kashen

Customer

EFACEC Contracting Central Europe GmbH (Austria)

Year

2017

Scope of work

  • Installation of 20 MVA,110/35/6 kV power transformer
  • Performing of oil purification and heating activities
  • Commissioning of system with participation of Customer

 

Project name

Construction of new 6/0.4 kV substation for Medical Center in Vanadzor

Customer

“Filishin” LLC (Armenia)

Year

2016-2017

Scope of work

  • Supply, installation and commissioning of 1000 kVA, 6/0.4 kVtransformers
  • Manufacturing and installation of 6kV power cubicles
  • Manufacturing and installation of 0.4 kV power cubicles
  • Manufacturing and installation of busbar system
  • Supply and installation of power and control cables
  • Installation of connection and end terminations
  • Installation of lighting system
  • Full set of commissioning works

 

Project name

Partial rehabilitation of 110 kV substation at “Yerevan-3 HPP”

Customer

“Power Engineering and Consulting PTE” LLC (Singapore)

Year

2016

Scope of work

  • Dismantling of power cables
  • Dismantling of 110 kV surge arresters
  • Dismantling of steel concrete constructions
  • Dismantling of steel structures, busbar systems and post insulators
  • Reconstruction of cable tranches
  • Installation of double-wall pipes
  • Installation of post insulators
  • Installation of busbar system
  • Installation of power cables
  • Installation of end-terminations
  • Commissioning works

 

Project name

Repair of 10 kV busbar system at Hrazdan HPP

Customer

“Zenon” LLC (Armenia)

Year

2016

Scope of work

  • Supply and installation of polymer post insulators
  • Commissioning works

 

Project name

Electrification of Oil-refinery at the station Karmir Blur

Customer

Armenian International Airports JSC (Armenia)

Year

2016

Scope of work

  • Design of electrification
  • Supplying and installation of LED lamps
  • Installation of control cubicles
  • Installation of power cables
  • Civil construction works

 

Project name

Reconstruction of 10 kV cable line

Customer

“Electrical Networks of Armenia” CJSC

Year

2016

Scope of work

  • Installation of power cables
  • Installation of connection and end terminations
  • Civil construction works for cable trench construction and rehabilitation of asphalt roads afterwards

 

Project name

Partial re-allocation of 220 kV transmission line Meghri-1

Customer

Zangezur Copper Molibdenum Combinat CJSC (Armenia)

Year

2015-2016

Scope of work

  • Supply and installation of 6 (six) 220 kV transmission line steel structures
  • Dismantling of 4 (four) 220 kV transmission line steel structures

 

Project name

Construction of 10 kV substation and OHL for copper mine Lichk

Customer

Zangezur Copper Molibdenum Combinat CJSC (Armenia)

Year

2015-2016

Scope of work

  • Supply and installation of container type substation
  • Manufacturing, supply and installation of necessary steel structures and foundations for the substation and OHL
  • Complex testing and commissioning of installed equipment

 

Project name

Construction of new 220 kV transmission line Hrazdan-Shinuhayr

Customer

Kalpataru Power Transmission LTD (India)

Year

2015

Scope of work

o Manufacturing of the form-boxes for the monolith foundations

 

Project name

Rehabilitation of 35/6 kV Substation-1, Substation-2 and Substation-3

Customer

"Armenia International Airports" CJSC

Year

2015

Scope of work

  • Complex repair of protection relay system with the replacement of necessary parts
  • Complex commissioning of the of relay protection, alarm, automation systems and oil circuit breakers

 

Project name

Construction of new 110 kV substation “Kashen”

Customer

EFACEC Contracting Central Europe (Austria)

Year

2014-2015

 

 

Scope of work

  • Consultation and supervision of design works and civil construction
  • Installation of equipment and machinery in 110 kV switchyard
  • Installation of equipment and machinery in control building, 35 kV switchgear and 10 kV switchgear
  • Installation of lightning protection system
  • Manufacturing and installation of steel structures, incl. OHL Gantries, busbar and equipment support as well as other supporting structures as cable racks for 35 and 10 kV cables
  • Installation of electromechanical materials like HV clamps, ACSR conductors, busbars, glass chain insulators
  • Connection of all equipment to the substation earthing system
  • Installation of outdoor lighting system on the 110 kV switchyard
  • Installation of control, measuring, communication and relay protection panels for 110 kV, 35kV and 10kV switchgears
  • Installation of LV control and power cables
  • Installation of MV control and power cables
  • Installation of auxiliary supply equipment - AC distribution boards, DC distribution boards, battery and chargers
  • Commissioning of all installed equipment and system

 

Project name

Commissioning of equipment at copper mine Teghout

Customer

Simartek CJSC (Armenia)

Year

2014

Scope of work

  • Primary circuit resistance check
  • Testing of busbar system and high-voltage circuit breaker
  • Circuit breaker flow resistance check
  • Transformer isolation resistance check
  • Current transformer magnetic curves creation
  • Voltage transformation coefficient
  • Secondary circuit check
  • Complex commissioning of 10 and 6 kV power cells

 

Project name

Construction of Dilijan International School

Customer

RD Construction Management (Russian Federation)

Year

2013-2014

 

Scope of work

  • Installation of 42,5 km of power cable lines
  • Construction of earthing system for “Medical Center” building
  • Reallocation of 10 kV OHL
  • Installation of outdoor lighting system
  • Construction of low current sewage system
  • Installation of internal lighting system
  • Installation of control cubicles
  • Commissioning of power cubicles
  • Manufacturing of foundations for the lighting towers

 

Project name

Construction of new 110 kV substation “Matur”

Customer

EFACEC Contracting Central Europe (Austria)

Year

2013-2014

Scope of work

  • Installation of equipment and machinery in 110 kVswitchyard
  • Installation of equipment and machinery in control building, 35 kV switchgear and 10 kV switchgear
  • Installation of lightning protection system
  • Manufacturing and installation of steel structures, incl. OHL Gantries, busbar and equipment support as well as other supporting structures as cable racks for 35 and 10 kV cables
  • Installation of electromechanical materials like HV clamps, ACSR conductors, busbars, glass chain insulators
  • Connection of all equipment to the substation earthing system
  • Installation of outdoor lighting system on the 110 kV switchyard
  • Installation of control, measuring, communication and relay protection panels for 110 kV, 35kV and 10kV switchgears
  • Installation of LV control and power cables
  • Installation of MV control and power cables
  • Installation of auxiliary supply equipment - AC distribution boards, DC distribution boards, battery and chargers
  • Commissioning of all installed equipment and system

 

Project name

Construction of new 10/0.4 kV SS and 10 kV OHL “Gyumri City”

Customer

“Electrical Networks of Armenia” CJSC

Year

2012-2013

Scope of work

  • Installation of steel-concrete supports
  • Manufacturing of earthing system and installation of the wire
  • Installation of power transformer
  • Installation of power panels
  • Installation of power cables
  • Manufacturing and installation of strip foundations
  • Soil works
  • Construction of the substation building

 

Project name

Manufacturing of steel structures

Customer

“South Caucasian Railroad” CJSC

Year

2012

Scope of work

o Manufacturing of steel structures for the train stations

 

Project name

Rehabilitation of 6 kV substations N1 and N4 at Airport “Shirak”.

Customer

“Armenian International airports” CJSC

Year

2012

Scope of work

  • Repair and re-commissioning of relay protection system
  • Repair and re-commissioning of automatic protection system
  • Repair and re-commissioning of oil filled circuit breakerssystem
  • Repair and re-commissioning of alarm system

 

Project name

Construction of second power supply scheme for airport “Shirak”

Customer

“Armaeronavigation” CJSC

Year

2012

Scope of work

  • Civil construction works
  • Installation of steel pipes
  • Installation of power cables and terminations
  • Installation of compact transformer substation
  • Manufacturing and installation of distributional panels

 

Project name

Inspection and repair of power transformers

Customer

"GeoProMiningGold" LLC

Year

2012

Scope of work

  • Inspection and repair of 6kV, 63 kVA power transformers
  • Inspection and repair of 6kV, 160 kVA power transformers
  • Inspection and repair of 6kV, 250 kVA power transformers
  • Inspection and repair of 6kV, 400 kVA power transformers
  • Inspection and repair of 6kV, 630 kVA power transformers
  • Inspection and repair of 6kV, 1000 kVA power transformers
  • Inspection and repair of 6kV, 1600 kVA power transformers

 

Project name

Installation works at branch” South”

Customer

“Electrical Networks of Armenia” CJSC

Year

2011

Scope of work

  • Removal of 6 kV power panels
  • Removal of 10 kV power panels
  • Installation of 6 and 10 kV power cells
  • Civil construction works
  • Installation of the power cables
  • Commissioning of the installed equipment

 

Project name

Construction of pump station Artashar

Customer

Armenian Branch of SADE (France)

Year

2011

Scope of work

  • Delivery and installation of the power supply panels
  • Delivery and installation of the power cables
  • Installation of the earthing system
  • Installation of the current protection system in the main pump power panel
  • Installation of the external lighting system of the pumpstation
  • Complex commissioning of the installed equipment

 

Project name

Repair works on 220 kV SS “Kamo”

Customer

CJSC “High voltage electrical networks of Armenia”

Year

2011

Scope of work

o Installation of 35 kV cable end-terminations

 

Project name

Construction of Hrazdan TPP UNIT N 5

Customer

“Interautomatika” JSC (Russian Federation)

Year

2010-2011

Scope of work

  • Installation of control, measurement and automation equipment of main building, Heller tower, cost pump station, gas regulatory and gas preparatory buildings, chimney, pressurized air compressor building
  • Installation of power supply panels and UPS equipment of technical programming complex
  • Installation of controller cubicles, communication devices, intermediary terminals, intermediary relays, secondary converters of mechanical quantities and vibrations, over speeding protection
  • Installation of network equipment panels
  • Installation of control panels
  • Installation of technical programming complex components on the unit control panel, including installation of the common usage screens
  • Installation and connection ofpower supply cables of technical programming complex
  • Installation and connection of network cables
  • Installation of power unit simulator equipment
  • Installation of the communication systems with the local control systems (gas turbine, gas pressurizing station, erection system and synchronization of the steam turbine generator, switchyard 220 kV, water heating boiler)

 

Project name

First Stage of SCADA/COMMUNICATION Project

Customer

ABB AB Network Management (Sweden)

Year

2008-2011

Scope of work

  • Removal of debris (of old equipment), clearing position for the newequipment
  • Digging of cable routes in outdoor switchyards
  • Erection of cubicles including preparatory civil works
  • Installation of cubicle support bars, cable trenches and cable ladders
  • Earthing of cubicles and wall mounted panels
  • Installation of cables between RTUs and plant sources, between AC/DC distribution and RTUs and between RTUs and Telecom cabinets
  • Fitting of glands for a/m cables
  • Termination, applying ferrules/lugs of cables and wires
  • Installation of transducers and auxiliary relays (in plant cubicles) asapplicable
  • Termination and testing of modified circuits in plant
  • Wiring check of all installed cables/wiring (continuity test)
  • Testing of new and existing equipment such as transducers, command interposing relays, indication and alarm relays
  • Installation of RTU, battery, battery charges and generators
  • Testing of each signal from plant source up to terminals in the SCADAequipment

 

Project name

First Stage of SCADA/COMMUNICATION Project

Customer

ELTEL Networks Oy (Finland)

Year

2008-2011

Scope of work

  • Installation of cables (including fixing)
  • Installation of OPAC cable in the pipe
  • Works for DPLC (Hrazdan HPP - Sevan HPP)
  • Works for the existing DPLC (SS Agarak - SS Shinuair)
  • Works for the existing DPLC (Spandaryan HPP - Shamb HPP)
  • Excavation and preparation of the trench for the OPAC cable
  • Civil works for DPLC
  • Manufacturing and installation of foundations

 

Project name

Rehabilitation of 110 kV substation Vanadzor-1

Customer

SIEMENS AG (Austria)

Year

2009-2010

Scope of work

  • Delivery and installation of 110 kV power equipment (power transformers, rotary disconnectors, current transformers, voltage transformers, surge arresters and support insulators)
  • Delivery and installation of all cable connections
  • Delivery and installation of power, control and protection cables
  • Installation of new control equipment
  • Delivery, installation and commissioning of all terminal boxes for the measuring transformers
  • Replacement of all earthing devices including connection of new equipment and all portals
  • Installation of lighting system
  • Delivery and installation of the secondary switchgear
  • Delivery, installation and commissioning wave-layers for 220 kV PLC transmission including the fixing and earthing equipment
  • Commissioning of PLC equipment
  • Delivery and installation of foundations under the power equipment

 

Project name

“Kajaran/Armenia.110/35/6 kV substation “Combine”

Customer

AREVA Energietechnik GmbH (Germany)

Year

2009-2010

Scope of work

o Site supervision for the installation part of the works

 

Project name

“Kajaran/Armenia. 110/10 kV Substation “Aghats”

Customer

AREVA Energietechnik GmbH (Germany)

Year

2009-2010

Scope of work

o Site supervision for the installation part of the works

 

Project name

Rehabilitation of “Khrami-2” HPP (Georgia)

Customer

LANCEFORD COMMERCIAL INC

Year

2008

Scope of work

  • Commissioning of batteries, chargers and inverters
  • Commissioning of the 220 V and 48 V DC panels
  • Commissioning of 0.4 kV distribution panel
  • Commissioning of 10.5 kV distribution panel